May : AH-30kW pitch controlled wind turbine and hydraulic tower system were installed at Kaishan Island
June: The second phase of the wind power supply project at Antarctica Taishan Station was started
October: AH-20kW pitch controlled wind turbine was installed in batches in Xinjiang